Otterblog
A record of the renovation of a
Wooden Drascombe Longboat 'Otter'
13th February 2007. Second strake and centreboard case fitting.
|
Finished bevelling the second strakes for a perfect fit.
|
|
Fitted
butt straps inside and out.
|
|
Used
6mm bolts.
|
|
Butt
straps. The inner 9mm ply one will be bonded inside whilst the outside
one will be removed once the resin is set.
|
|
I
braced the middle bulkhead and cut away the rest of the centreboard case.
After I have finished planking and re-inverted the hull I will remove
most of this bulkhead.
|
|
Dry
fitted centreboard case to see if it fitted. It did!
The new rear of cabin / front of cockpit bulkhead will be at the rear
of the centreboard case.
|
|
Bonded
the two sides of the centreboard case and the end fillets.
Watch video at Youtube
|
|
<Previous Home Next>
Unless stated otherwise, © Colin Watt 2006, 2007
Please read the disclaimer.
Last updated: 15 February, 2007
|